HVAC maintenance
Heating, ventilation and air conditioning serviced to a schedule, so faults are found before the hottest or coldest week of the year.
For business owners and facilities managers responsible for a building that has to stay open. One contract covers the plant, the fabric and the testing, with every job evidenced before it is signed off.
Hard facilities management is the upkeep of the physical building and the fixed systems inside it: heating and cooling, electrics, water, lifts, fire systems, the roof and the fabric. When one of these fails, the building stops working, and usually at the worst possible time.
Most sites end up with a separate contractor for each system, a separate invoice for each visit and nobody holding the whole picture. We take that off you. You deal with 3S Consult™, we allocate the work to a vetted, SSIP-accredited subcontractor on our panel, and the job is photographed against the specification before anything is certified for payment.
Heating, ventilation and air conditioning serviced to a schedule, so faults are found before the hottest or coldest week of the year.
Distribution, lighting and remedial works carried out by accredited electrical contractors.
Repairs, planned servicing and water hygiene, including legionella control.
Alarms, sprinklers, extinguishers and emergency lighting maintained and logged under the same contract.
Maintenance visits and support for the statutory thorough examinations your insurer will ask about.
Roofing, windows, doors and flooring, scoped properly before a price is agreed.
A schedule of visits built around your assets, so the work is booked rather than remembered.
Breakdowns and make-safe work prioritised when you flag them as urgent.
Gas safety, PAT, legionella and EICRs scheduled and certificated.
A building run only on reactive call-outs costs more than it looks. Each breakdown is priced in a hurry, parts are bought at short notice and the same fault tends to come back. A planned maintenance schedule turns most of that into booked visits at an agreed cost.
Reactive cover still matters, because plant fails without warning. The aim is a schedule that catches the predictable faults, with a clear route for the rest. Urgent and make-safe works are prioritised, and most requirements are matched to a subcontractor within 48 hours.
Missing records are the common one. The work was done, but nobody can find the certificate when an insurer or inspector asks. The other is plant run well past its useful life because replacement never makes it into the budget. We keep the record at every stage, and plant replacement can be funded over a fixed term instead of waiting for next year.
Share the site, the problem and the timescale on the enquiry form. We visit, confirm the scope and pick up anything that would move the price later.
Works cost and consultancy fee are combined into a single proposal, with a funding option alongside it. Any finance facility is agreed before the contract is signed.
A vetted subcontractor accepts the scope and commits to a start date. Completion photographs are checked against the specification before the work is certified.
Boiler, chiller and air handling replacement, rewiring and major fabric works rarely land when the budget allows. Through our sister business, Novora Asset Finance™, plant replacement and hard FM programmes can be spread over a fixed term with payments agreed before you commit. Finance is subject to status and credit approval, and Novora Asset Finance™ sets out the terms, total cost and any fees before you commit.
The subcontractor uploads completion photographs against the specification, and we check them before sign-off. Work that fails inspection is not certified for payment. Test certificates and service records are filed with the job, so you have a record of each stage when an insurer or inspector asks.
With us. We hold the appointment, monitor the work and certify payment. The subcontractor works to our specification, which keeps the standard consistent from one job to the next.
Yes. We start with a site visit to see what is there and what condition it is in, then build a schedule from that. Anything urgent is dealt with first.
Most requirements are matched within 48 hours. Urgent and make-safe works are prioritised, so flag it on the form or call us and we will act rather than wait for the system.
It can be. Gas safety, PAT, legionella control and EICRs can all sit under the same contract as your planned maintenance, with the certificates filed together.
Yes. A single contract can cover planned maintenance, statutory testing, cleaning, security and grounds, with one point of contact for all of it.
For landlords, business owners and facilities managers who need their statutory testing done on time and recorded. We schedule it, deliver it and keep the certificates together.
Read more →Fire safety, fully coveredFor business owners, landlords and facilities managers who carry the fire safety duty for a building. You get the assessment, the fixes and a fire logbook that stands up to an inspector.
Read more →Asset financeFor businesses that need plant, vehicles, IT or equipment without handing over the full price on day one. The cost is spread into fixed monthly payments, arranged through Novora Asset Finance™.
Read more →